specific analysis or tests Assess the associated system risk, by specific analysis or testing Propose mitigation, e.g. requirements, design changes, detection, maintenance, training, by which the risks may be lowered and controlled for at an acceptable level. Determine the best mitigation and get agreement on final, acceptable risk levels, possibly based on cost-benefit analysis. Factors of Influence in Reliability An unreliable information system is a risk for all organization due to…
Words 1441 - Pages 6