University of Toronto
Department of Mechanical and Industrial Engineering
MIE468: Facility Planning
(Winter 2014)
Instructor
Dr. Kevin D. Ferreira, RS 308, ferreira@mie.utoronto.ca
Office hours: Wed 4-5pm or by appt.
TA
Derya Demirtas, RS 206, demirtas@mie.utoronto.ca
Mohammad Reza Sharifi, BA 8145, soroush@mie.utoronto.ca
Lectures
Mon 11-12pm
Tues 3-5pm
GB244
GB119
Tutorials
Thurs 3-5pm
SF3201
Course Site
on portal.utoronto.ca
Textbook
Facilities Planning (4th edition), Tompkins, White, Bozer, & Tanchoco. John
Wiley and Sons.
Supplemental - Facilities Design (3rd ed.), Sunderesh Heragu. CRC press. reading - Supply Chain Management (2nd ed. or later), Chopra and Meindl. Prentice Hall.
- Integer programming, Laurence Wolsey. John Wiley and Sons.
Description
Fundamentals of developing efficient layouts of production/service systems and determining optimal locations of facilities in a network. Activity relationships, manufacturing flow patterns, layout procedure types (construction and improvement algorithms), manual and computerized layout techniques, single and multiple facility location, and supply chain (location) network-distribution design. Prerequisite
MIE262 or higher (especially linear and integer programming)
Policies
Academic integrity: Students are reminded of the seriousness of academic dishonesty in any form, including plagiarism. Students are expected to adhere to the “Code of Behaviour on Academic Matters” as well as the “Code of Student
Conduct” available at http://www.governingcouncil.utoronto.ca/policies/behaveac.htm and at http://www.governingcouncil.utoronto.ca/policies/studentc.htm, respectively.
General academic integrity information is available at http://www.utoronto.ca/academicintegrity/. Communication: I access my email during regular business hours. Email should not be seen as an alternative to office hours, nor should it be used as a mechanism to receive private tutorials prior to an exam/assignment or on lecture material. Class-wide announcements will generally be made via the class website. Please post all questions regarding homework on the discussion board.
University of Toronto
Department of Mechanical and Industrial Engineering
MIE468: Facility Planning
(Winter 2014)
Grading
Late homework assignments will generally not be accepted. If you submit an official petition with adequate supporting evidence, it will be considered. A petition is also required for a missed midterm. If you request a re-grade, do not write anything in the exam booklet or assignment. Please write a note on a separate sheet of paper describing the reason for the re-grade request. The request must be submitted within one week of the exam/assignment being made available for pick up. See the academic calendar for rules and regulations related to petitions for final exams.
Final grades will be based on the following:
Final Exam
45%
Midterm Exam
30%
Homework
15%
Group Project
10%
The Midterm and Final exam are closed book, closed notes. A basic scientific calculator is allowed (no programming or graphing functions).
The Group project (~4 people, depending on the size of the class) will involve solving a layout or location/supply chain network design problem by using a mathematical optimization model and implementing the model on the computer using a modeling language. The results from the implementation must also be included and analyzed in a written report. The project is due April
4 and will be assigned at least two weeks before the due date. More details to be given later.
Homework assignments are due by 5pm on the Friday of the week indicated. Submit homework assignments to the drop box on the 2nd floor of RS. A TA will collect all assignments at 5pm.
Working with your classmates and discussing problem solving approaches is encouraged, but each of you must write and submit your solutions independently, and indicate with whom you collaborated. If you find information from the internet or
Related Documents: Essay on Facility Planning Notes
position. Note that some of the tasks are one-time actions; others are ongoing or repetitive for the duration of the incident. Tasks may be delegated to the appropriate Branch Director or Unit Leader. Task 1. Obtain briefing from Incident Commander: Review situation and resource status for number of personnel assigned to incident. Review current organization. Determine which incident facilities have been/should be activated. 2. Ensure Incident Command Post and other incident facilities are…
OVERVIEW The Clinic/Health Unit space types are facilities where outpatient ambulatory health services are provided. Sub-space types, such as office spaces, private toilets, and filing and storage areas are included. This space type does not include provisions for invasive surgery, in-patient services, medical diagnostic categories I, II, and III equipment (including exam lights and medical gas systems), radiological diagnostic services (including special structural elements and radiation shielding…
and professional matters 9 Planning and building regulations requirements 12 Site office and facilities requirements 14 Plant, labour and material requirements 15 Soft floor finish specifications 16 Appendices 17 Appendix 1 – Site Overview 18 Appendix 2 – Sports and Teaching Facility 19 Appendix 3 – Modcell “Balehaus” Straw Bale Case study 22 Appendix 4 – Croydon College Rotunda 23 Appendix 5 – Site Access 24 Appendix 6 – Site Storage and Facilities 27 Appendix 7 – Floor and…
student to the fundamentals of physical security and emergency planning, including the nature, scope, history, and essential elements of security in the workplace, with emphasis on the industry. Specific areas include the operational aspects of security strategies for identifying and controlling security exposures, applicable legal issues, personal protection, property and asset protection, role of intelligence, and concepts of disaster planning and management. II. COURSE GOALS This is a core course…
report on the following resource management techniques: critical path analysis (CPA) Gantt charts/ bar charts method study computer-based scheduling work measurement Produce a report that compares these techniques their usefulness for planning and managing construction projects.…
Stores. All of these are permanent accounts, except the last two that have yet to be closed. The installment receivables are current. Symphony uses 1. (TCO 4) Briefly explain the purpose of the disclosure note on significant accounting policies. Provide two examples of what might be found in this note. 2. (TCO 2) What is the SEC and how is it involved with accounting standard setting? 3. (TCO 5) Give an example of a non-cash financing and investing activity and explain when and how it would be reported…
long-term care facility here in Houston County. This facility offers long-term care services along with accommodations for one hundred and fifty live in patients. As the administrator of Houston County Care Center my responsibility is the quality and care for the patient or residents in whom is receiving care at the facility. Client satisfaction is of the utmost importance when it comes to the facility. Communication is key when it comes to my patients and clients at the facility. We have to be…
responsibilities. • ICS facilities and functions. • ICS planning. In addition, you will learn the steps you should take to be accountable for your actions during an incident. What Is the Incident Command System? The Incident Command System (ICS) is a standardized approach to incident management that: • Enables a coordinated response among various jurisdictions and agencies. • Establishes common processes for planning and managing resources. • Allows for the integration of facilities, equipment,…
deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract. [2] Creating a work breakdown structure is a vital tool for improving project planning and helping to track a project’s progress. The documents main purpose is to capture all of the activities that will need to be carried out in order to complete the work, and list these in a methodical way with assignment of responsibility for each…
Diagram is a method for project planning and –control. It is the graphical version of planned sequence of work. The Metra Potenzial Method (MPM) shows every process that has to be made in a project as a node. To represent the context between the activities the nodes are connected with arrows. The Network Diagram (Appendix 1.0) has been drawn based on the table 1 to show the activities at Hansdon Ltd for a solution to allow customer admissions to sports facilities. 2) Timing of activities and…